National Roads No. 2, 5 and 22 (RRIP II and III): Road Materials Testing and Field Quality Control
Between 2018 and 2023 MATLAB provided road materials testing and field quality control on National Roads No. 2, 5 and 22 under the Road Rehabilitation and Improvement Projects II and III, working for Daun Penh, Heng Sambat, Hanshin E&C and Ilsung.
Project facts
| Client / employer | Daun Penh, Heng Sambat, Hanshin E&C, Ilsung |
|---|---|
| Year | 2018 to 2023 |
| Location | National Roads 2, 5 and 22 |
| Sector | National highways |
| MATLAB scope | Road materials testing and field quality control |
What MATLAB delivered
Highway rehabilitation needs layer-by-layer approval: subgrade and base course compaction and CBR, aggregate gradation and abrasion, bitumen properties, Marshall testing of asphalt premix and core thickness on the finished surface. Our teams delivered these on the alignments and in the laboratory to the ASTM and AASHTO methods in the specifications.
Repeat work with four contractors over five years reflects the consistency the supervising engineers found in our results.
Services used on this project
Need the same for your project?
MATLAB Materials Laboratory holds MLMUPC General Construction Laboratory License No. 0001 and CANC registration GDAC-RCAB/0025/2026. Call +855 11 922 823, email contact@imecskh.com or request a quotation. Back to all projects.